home page

polandHeeliaStandards and parameters

2024-03-26 00:48:30release

The use of standard section connecting bolts should comply with the user manual and specification requirements.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.poland,polandHimsk,Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professionalMonthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, clean it with compressed air, and then return it to the oil tank and connect the pipeline.Salatiga,The list of materials for making landing doors is as follows: Table : List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods the operating failure rate can be reduced to a low level.Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, personnel and property losses.


polandHeeliaStandards and parameters



It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easierDuring maintenance or when problems occur, the power supply should be cut off in a timely manner. After lifting,polandNijack, the aluminum alloy electric elevator should be firmly fixed before maintenance can be carried out. It is strictly prohibited to operate with defects to avoid accidents.Monthly maintenance and inspection of hydraulic lifting platform rollers intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.property right,The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications as specified in the above table.


polandHeeliaStandards and parameters



The use of standard section connecting bolts should comply with the user manual and specification requirements.Installation materials,The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum, chemical, hotel, sports center, mining,polandBaile Atha I, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic liftingThe hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).poland,The landing door should meet the requirements of the specifications and achieve standardization.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


label:
4answers
Lixing Chemical
2floor-- · 2024-03-26 08:20:00

After my personal experience, the reputation of this store is quite good. polandHeelia The quality is more like a diamond. Thank you so much!

See more
Large-scale eve
3floor-- · 2024-03-26 08:39:22

polandHeelia The price is very high, and the quality is very good if you can buy it at such a price.

See more
Hualong Commerc
4floor-- · 2024-03-26 09:38:19

Since the last time I bought your polandHeelia, this new model has indeed met the standard and is very good, giving you a good comment.

See more
Hongcheng Stone
5floor-- · 2024-03-26 09:46:26

polandHeelia It was posted very quickly, really timely, please give me a thumbs up

See more
Sign in Post answer
Related issues
view all
Collectors(1)