home page

Vienna New TownAdvance support of small conduitCarry out skills training in high-risk industries

2024-03-28 04:35:24release

It has good air tightness, low gas permeability, strong sealing and no leakage.A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning,Vienna New TownLeading small conduit manufacturer, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, and it cannot be too long or too short, otherwise the thread length is not enough.Vienna New Town,Grouting classification (I) grouting construction before and after the exposure of water bearing rock and soil layer is classified as follows: Pre grouting: the grouting works carried out before the shaft, tunnel, basement and other structures are dug or when they are close to the aquifer are called pre grouting. Ground pre grouting and working face pre grouting are common in the coal industry. The pre grouting method is used for water plugging and reinforcement of rock and soil to prevent accidents in advance.The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?Turrialba,Two convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes, which plays a double safety sealing effect.The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation. Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides.


Vienna New TownAdvance support of small conduitCarry out skills training in high-risk industries



In China, the types of grouting pipes are relatively complete now, from grouting pipes and grouting pipes for Reinforcing Subgrade to glass fiber grouting pipes for highway pavement, which can not only ensure the quality of the road but also save the cost. So what kind of application effect can the grouting pipe achieve in highway maintenance? The grouting pipe manufacturer will take you to have a look.[] it should be noted that the above specific embodiments are only exemplary. Under the above teachings of the utility model, those skilled in the art can make various improvements and modifications on the basis of the above embodiments, and these improvements or modifications fall within the protection scope of the utility model. Those skilled in the art should understand that the above specific description is only for the purpose of explaining the utility model, and is not intended to limit the utility model. The scope of protection of the utility model is defined by the claims and their equivalents. Grouting pipe at tensioning end: the grouting pipe installed at the end of the grouting pipe reinforcement and capable of tensioning is also called grouting pipe grouting pipe. The so-called grouting pipe is a grouting pipe in post tensioning structure or component to maintain the tension of the grouting pipe reinforcement and transmit it to the mixed tension; Fixed end grouting pipe: a grouting pipe installed at the end of the grouting pipe reinforcement and usually buried in the concrete without tensioning. The standard of the grouting pipe used for the grouting pipe reinforcement is the national standard of the people&#;s Republic of China (GB / T -, which ensures that the products manufactured by our company conform to the product quality law of the people&#;s Republic of China and the standard law of the people&#;s Republic of China Grouting pipe is the only acoustic pipe specially used for ultrasonic testing in the market. The grouting pipe is made of cold and hard steel pipe after professional molding, and is connected by clamp pressure connection, screw connection,Vienna New TownAdvanced small conduit processing, flange connection and other methods. It has a reliable anti-seepage effect during concrete pouring. Two convex grooves are planned at the end of the bell end of the high-strength double seal clamp type acoustic measuring pipe, and the convex grooves are equipped with sealing rings. When installing the device the socket end of the product is stabbed into the bell end by cm, and then the two convex grooves are kneaded together with special hydraulic pliers. The pipe at the kneaded part is shortened and deformed after being stressed,Vienna New Town22hollow composite anchor manufacturer, and the outer pipe between the two convex grooves is deeply immersed into the inner pipe, and then the reliable connection of the product is completed; After being kneaded, the rubber sealing ring deforms and fits between the two layers of pipes, playing an excellent double safety sealing effect.retailer,Causes of wrinkling: the blanking specification of pipe joint is too long.Can the stretching speed of grouting pipe be defined?The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.


Vienna New TownAdvance support of small conduitCarry out skills training in high-risk industries



The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.Quality department, The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.The installation will not affect the characteristics of the building grouting pipe itself; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed; Ccll-y series grouting pipe: grouting once, not reusable ccll-d series grouting pipe: multiple times of grouting, grouting is not limited by time.It is applicable to waterproof joints of subway, tunnel and basement. If there is water leakage, grout can be injected into the pipe body to fill and seal. It is very suitable to install grouting pipes between the joints of new and old concrete. Various materials such as cement slurry, the joint can be sealed by injecting slurry into the PVC port or spring skeleton port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way.The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?Vienna New Town,The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in China


label:
4answers
Zanyan Technolo
2floor-- · 2024-03-28 12:12:05

The delivery speed is very fast, give your company a thumbs up

See more
Reyuan Network
3floor-- · 2024-03-28 12:12:07

Really a good seller. I have to find you if I have this Vienna New TownAdvance support of small conduit demand in the future!

See more
Bangheng Metal
4floor-- · 2024-03-28 12:58:46

Happy cooperation and tight packaging. Let’s talk about business services: Like

See more
Except for fina
5floor-- · 2024-03-28 13:26:25

I finally received what I needed Vienna New TownAdvance support of small conduit, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping experience. Whether it is the attitude of the store or the items, I am very satisfied. The attitude of the store is very professional and enthusiastic, answering all questions, and the response is very fast. I asked a lot of questions, and he did not feel annoying, and he would answer me seriously. For this, I would like to express my sincere respect to you. There are not many good stores like this. .

See more
Sign in Post answer
Related issues
view all
Collectors(1)