home page

SitaCar mounted aluminum alloy lifting platformRelease signal

2024-04-11 02:19:16release

SitaMast type aluminum alloy hydraulic lifting platform,

Clean and inspect the crown wheel frame assembly, correct or replace with new partsKnowledge of pressure lifting platforms, boarding bridges, mobile elevators, and more is available in Jiuheng, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory cooperate and negotiate, and seek common development. The following maintenance and upkeep are required for the lifting cargo elevator: Maintenance and upkeep: Maintenance and upkeep should be carried out by the equipment operator or full-time personnel of the operating unit. The equipment maintenance and upkeep unit is responsible for supervising and reviewing the maintenance content. The main content of maintenance and upkeep is summarized as follows:; quot; Cross operation method; quot;: Clean, tighten, smooth, adjust, and prevent corrosion. Before and at the end of each shift,SitaSelf folding arm lifting platform, to minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, pay attention to the sound of mechanical operation, and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for managementSita,Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising, the rocker will automatically prevent wheelchair platform.Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracketMokegua,Check if the orientation of the upper and lower limit blocks on the guide rail frame is correctAll connecting shafts must have split pins and be sufficient.Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.


SitaCar mounted aluminum alloy lifting platformRelease signal



Check and clean the driving gears and guide wheels of the elevator. If there is excessive wear, it is necessary to replace themThe arrangement of vibration points should be based on the vibration aging process standard GB/T-. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.Check the smooth steel wire rope and various fasteners, if there is excessive wear, it is necessary to replace themQuality documents,When loosening occurs, newly processed and assembled components have deviations in geometric shape and fitting dimensions. In the early stages of use due to alternating loads such as impact and vibration, as well as factors such as heat and deformation, coupled with rapid wear and tear, it is easy to cause the previously fastened components to loosen.Check the protective cable condition of the cable guide frameCheck if the orientation of the upper and lower limit blocks on the guide rail frame is correct


SitaCar mounted aluminum alloy lifting platformRelease signal



Check all standard sections and diagonal support connection points. Check the fastening bolts of the gear rack and ensure that the motor cooling wing plate and organization are cleanWhere to sell API,When installing, disassembling, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than %. The meshing clearance should be suitable for each box, distribution box, etc., and should be kept clean regularly. Dust on electrical equipment should be cleaned in a timely manner. When encountering overheating in the electric motor, it is necessary to stop it in a timely manner and troubleshoot before continuing to operate. The motor bearings should be in good condition, and the hydraulic cargo elevator should provide us with safety protection. The application of hydraulic cargo elevators in our production is already very common and plays an important role in our production, especially in high-altitude operation of goods.Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of - tons and an elevation of - meters guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure, which is safe, convenient, fast, and practical. The pit depth is generally cm-cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, Strong overload capacity, corrosion resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for - story steel structures or concrete factories, and can be used both internally and externally.  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities,SitaFully self-propelled scissor lift, the investigation shall be serious, the rectification shall be resolute, and the results shall be consolidated.Sita,Quarterly maintenance: Check the items checked each monthRegarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracketCheck the fastening status of the wall bracket, support rod, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightened


label:
5answers
TECO Jusheng El
2floor-- · 2024-04-11 09:34:46

It is still affordable to buy things online, SitaCar mounted aluminum alloy lifting platform I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also very fast.

See more
Kangshuo Additi
3floor-- · 2024-04-11 09:51:44

Can you give me a discount next time I buy it, SitaCar mounted aluminum alloy lifting platform The quality is good, and I will live up to the boss

See more
mesh
4floor-- · 2024-04-11 10:01:04

Your company SitaCar mounted aluminum alloy lifting platform has a very good service attitude, thank you, and like you.

See more
gabion metal pr
5floor-- · 2024-04-11 10:34:54

Yes, the top one, honest SitaCar mounted aluminum alloy lifting platform seller. I have come to buy it a few times, and the service to old customers is very attentive, and I will come often in the future!

See more
gather co., ltd
6floor-- · 2024-04-11 10:45:58

Finally got SitaCar mounted aluminum alloy lifting platform So happy that! The workmanship is great.

See more
Sign in Post answer
Related issues
view all
Collectors(1)