home page

Hu MingThree phase temperature of dry-type transformerAnalysis of the effect of empty draw

2024-04-12 00:01:11release

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the goal of long-term treatment of leakage can be achieved.Hu Ming,The top and middle of the transformer oil tank the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.The noise of dry-type transformer comes fromLanaka,The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.On load commissioning:


Hu MingThree phase temperature of dry-type transformerAnalysis of the effect of empty draw



The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.It is understood that in China,Hu MingApplication of dry-type transformer, S Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb- and jb - Specifications operating in the power network at that time. Since the th century, urban power grids have been transformed all over the country, and S series distribution transformers have been used to replace S Series. In recent years, S and S commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is % - % less than that of S transformer.The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.reform,Oil immersed transformerWhen the transformer is put into operation, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective,Hu Ming100 box type transformer, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.The key reason for oil leakage is that there are defects in cast iron parts


Hu MingThree phase temperature of dry-type transformerAnalysis of the effect of empty draw



Method and process of taking oil sample of power transformerPackaging strategy,Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.At that time, only a few companies in China could produce kV high-voltage transformers, and the market share of high-voltage transformers was basically monopolized by overseas leaders.The input and output three-phase power lines shall be connected to phase a phase B and phase C respectively according to the color of yellow,Hu MingPower tube, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.Hu Ming,After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.Connection group structure of dry-type transformerIf the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).

label:
5answers
gold steel mesh
2floor-- · 2024-04-12 07:11:19

Hu MingThree phase temperature of dry-type transformerHow is the quality? Do you have it in stock?

See more
Construction of
3floor-- · 2024-04-12 07:50:29

Old acquaintances, things are as good as always, genuine Hu MingThree phase temperature of dry-type transformer, outstanding cost performance

See more
Provide paid he
4floor-- · 2024-04-12 08:12:16

Buying things online is about integrity, and you do it! Thank you Hu MingThree phase temperature of dry-type transformer Like one Fast delivery, very good attitude, very satisfied! very good!

See more
Baigou New Town
5floor-- · 2024-04-12 08:57:12

After receiving the goods, I feel that the quality Hu MingThree phase temperature of dry-type transformer is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

See more
wah fu glasswar
6floor-- · 2024-04-12 08:59:40

Finally got Hu MingThree phase temperature of dry-type transformer So happy that! The workmanship is great.

See more
Sign in Post answer
Related issues
view all
Collectors(1)