home page

WarsawWanghuaTo make the service tangible

2024-04-12 01:31:47release

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors,WarsawGra, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.Warsaw,When adding hydraulic oil,WarsawYeleniagula, Poland, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.Chimbarongo,The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between m and m. And there should be at least protective railings a half height middle crossbar, smooth lifting and low noise.


WarsawWanghuaTo make the service tangible



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.Limit switches should be triggered directly by the movement of the suspension cage or its related components.The net height of the landing door opening should not be less than m,WarsawPwotsk, the size of any through-hole and opening related to the distance between any door and adjacent moving parts except for the gap between the lower part of the door that should not exceed mm, as well as the gap around the door or between parts, should comply with the provisions of Table of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB-.build,In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between m and m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least mm above the ground.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.When the wall bracket adopts non matching standard products, design calculations should be carried out.


WarsawWanghuaTo make the service tangible



Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.Honest management,The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).Warsaw,The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.The scaffolding of the parking platform should be laid tightly and firmly.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.


label:
5answers
Maintenance of
2floor-- · 2024-04-12 08:51:20

I just received it this morning and I like it very much. I'll come next time, can you introduce a friend to buy WarsawWanghua for a discount?

See more
marine cable
3floor-- · 2024-04-12 08:59:31

Thank you faithfully, let me buy the dream WarsawWanghua, thank you so much!

See more
Shiji Optoelect
4floor-- · 2024-04-12 09:11:02

Follow you WarsawWanghua for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected. The boss praised it.

See more
Runtian Sculptu
5floor-- · 2024-04-12 10:01:22

WarsawWanghuaVery good, very supportive, very good quality, exactly the same as described by the seller, and the price is cheap

See more
yusheng trading
6floor-- · 2024-04-12 10:22:06

After so many years of online shopping, this is the first time I have taken this seriously. I was holding my phone and staring at the screen with a sense of anxiety, and I dared not start. In order to write a notarized evaluation of WarsawWanghua, send four characters, high quality and low price. This is my happy online shopping, thank you!

See more
Sign in Post answer
Related issues
view all
Collectors(1)