home page

LetoCold storageWhat are the processing flow standards

2024-04-12 04:30:18release

The two sets of connectors between the cold storage shall be wedged tightly, and the two sets of connectors shall be fixed at the upper, outer and lower sides of the cracks in the cold storage respectively. The lower connector shall be as close as possible, so as to facilitate the use of concrete to cover the connector in the future.These measures have achieved quite good results. Compared with several cold storages at a customer in Jining the cold storages using their white materials have significantly lower power consumption than those using other white materials.Leto,Air conditioning monitoring pan geographic air conditioning room monitoring system consists of front-end equipment, client / device app and PC large screen.First, so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel, and the two sets of connecting pieces shall be fixed on the upper, outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, it shall be about mm wide. If it does not meet the requirements remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter, pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.mauritius,Quick freezing storehouse is widely used. There are many kinds of temperature in quick freezing storehouse, and multi temperature or double temperature can be realized to meet the needs of different customers. Fault phenomena: unit current is large and voltage is too low; Loose wiring; The unit pressure exceeds the rated pressure; The oil separation core is blocked; Device failure; Host failure; Main motor fault; Fault phenomenon: the unit cannot be started and the fuse is broken; The temperature switch is broken; Loose wiring; Thermal relay of main motor acts; The thermal relay of cold storage fan motor acts; The transformer is broken; No power input (unit); Failure not eliminated (unit); The actuator is faulty.The closed cell structure and surface material of polyurethane rigid foam with good moisture-proof, and it can be made into inlaid connection structure during forming, which is easy to assemble. It does not need additional insulating layer to prevent moisture and saves a lot of trouble in laying insulating layer.Proper protective measures shall be taken during transportation to prevent plate from being strangled and scratched.


LetoCold storageWhat are the processing flow standards



Energy saving and power saving: the design cost of quick freezing warehouse mentioned above is very low, but it has a great impact on the cost of quick freezing warehouse and later use cost. The electricity bill is often an important expenditure item in the later stage. The design scheme of the show can greatly reduce the power consumption of the quick freezing warehouse. The selection of the back sunny side of the quick freezing warehouse, the selection of the thickness of the thermal insulation board should be appropriate, the tightness of the quick freezing warehouse door, and the temperature difference between the adjacent cold storage rooms should not be too large are all issues that we need to consider. There are also some tips, such as the use of air curtain machine on the quick freezing warehouse door. We remind users to use parallel units in quick freezing warehouse as far as possible and start them reasonably.Ammonia filling leak test: ammonia filling leak detection can be carried out after system blowdown and pressure leak test. The purpose is to improve the air tightness of the system and lay a good foundation for the work of ammonia filling and thermal insulation materials of the system. After air leakage detection, some obvious leakage points can be found. However, due to the poor air permeability, the leakage points blocked by dirt along the tiny sand holes are not easy to be detected. Therefore, ammonia must be filled. In addition to good permeability, ammonia also has odor and is easy to be found, At the same time, phenolphthalein test paper can be used for leak detection because it is rose red in the presence of ammonia.Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.Inspection requirements,Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, and the specific installation skills of the cold storage will also make some relatively detailed introduction for you in the following article. When installing the cold storage, you should install it from the corner first. Later, according to the height of the cold storage make a hole in the middle of the insulation board, and tighten the angle iron parts until there is a hole on the insulation boardWhether there is dirt on the condenser and poor heat dissipation will lead to too high condensation pressure of the refrigerator. In order to protect the compressor, the machine stops running under the action of the pressure controller. When the heat dissipation is good, press the black reset button on the pressure controller, and the machine can automatically resume operation.


LetoCold storageWhat are the processing flow standards



Establish a perfect computer network, make the distribution of refrigeration supply chain scientific, and achieve the traceability of food safety. In the European Union the United States and Japan, all members of the food supply chain have the legal responsibility to implement traceability.Test conclusion, - precautions for floor installation of cold storage: the floor shall be installed flat, the uneven part shall be leveled with materials,LetoCold storage professional installation company,LetoCold storage plant installation, and the locking hook between the plates shall be locked to ensure that the warehouse surface is flat without hollow feeling. (note that if this drainage system is installed outdoors in the north, the drainage pipe shall be insulated).Heat pump, hot water, refrigeration and other fields. Supporting downstream products include: household air conditioner, modular machine small water ground source heat pump, etc. At present, a single scroll refrigeration unit can achieve ~ HP.Improper adjustment or blockage of throttle valve, too large or too small refrigerant flow: improper adjustment or blockage of throttle valve will directly affect the refrigerant flow into evaporator. When the throttle valve is opened too large, the evaporation pressure and evaporation temperature also increase, and the decline rate of warehouse temperature will slow down; At the same time, when the throttle valve is opened too small or blocked, the refrigerant flow will also decrease, and the decline rate of warehouse temperature will also slow down.Leto,Pay attention to the energy saving of the lighting system: the lighting of the cold storage should be considered comprehensively according to the area, height and warehouse temperature of the cold storage on the basis of safety, science and rationality,LetoCold storage construction design, from the perspective of energy saving and environmental protection. The lighting in the cold storage is concentrated in the working area.The cold storage belongs to a kind of refrigeration equipment. Compared with the refrigerator, its refrigeration area is large, but they have the same refrigeration principle. So how to maintain the cold storage every day. Today I'll introduce how to do a good job in the daily management and maintenance after the installation of the cold storage.Some cold bridge prevention measures shall be taken at the joints between polyurethane insulation boards.

label:
5answers
Shelf layer net
2floor-- · 2024-04-12 11:40:04

Just paid, when will LetoCold storage arrive, boss.

See more
Alarm system
3floor-- · 2024-04-12 11:51:36

Just bought LetoCold storage, the quality workmanship is even worse. Look back and introduce to friends

See more
General cargo t
4floor-- · 2024-04-12 12:25:15

Although LetoCold storage has not yet arrived, I am looking forward to it, and the inquiry is still in transit.

See more
Elevator techni
5floor-- · 2024-04-12 13:08:58

I just received it this morning and I like it very much. I'll come next time, can you introduce a friend to buy LetoCold storage for a discount?

See more
Vehicle sales c
6floor-- · 2024-04-12 13:09:25
Sign in Post answer
Related issues
view all
Collectors(1)