home page

AlmeroAxle Co., LtdIndustry price policy

2024-04-19 00:53:34release

The pressure on the axle will reduce the service life of the boarding axle.There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.Almero,AlmeroHydraulic lifting boarding bridge,The hook of the seat belt should not be hung on unstable or moving objects. Professional quality assurance from axle manufacturers. The promotional activities are ongoing and new and old customers are welcome to come for consultationThe correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.San-Pedro-Sacatepequez,Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.Open the manual valve, slowly lower the boarding bridge, and secure more than % of the lip plates at the bottom of the container.


AlmeroAxle Co., LtdIndustry price policy



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.The natural frequency of the air spring is stable, so its performance is also stable, which means that the air spring is closer to the ideal state. How does the air spring change the air pressure in the airbag with different loads to achieve the goal of keeping the distance between the car body and the road surface unchanged. The height valve shown serves this purpose. The height valve is fixed on the frame and the connecting rod is connected to the hydraulic boarding bridge. The height valve has two valves, namely, the charging valve for air supply and the air release valve for air supply. These two valves are both connected by the rod. When the car load increases, the boarding bridge moves close to the frame, the connecting rod rises. When the connecting rod mechanism opens the charging valve,AlmeroContainer boarding bridge, compressed air enters the air spring, and the frame and body rise until the height of the body is restored.As we all knowquality indexCommon&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at % rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.


AlmeroAxle Co., LtdIndustry price policy



Shake the handle to raise the boarding bridge to the height of the container.For more, please check,To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, so it is not a major problem.The natural frequency of the air spring is stable, so its performance is also stable, namely, the charging valve for air supply and the air release valve for air supply. These two valves are both connected by the rod. When the car load increases, the boarding bridge moves close to the frame, the connecting rod rises. When the connecting rod mechanism opens the charging valve,AlmeroMoving the boarding bridge, compressed air enters the air spring, and the frame and body rise until the height of the body is restored.Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings, the hydraulic surface should be to millimeters higher than the bottom of the box. The hydraulic oil is darkened and at this position, sticky, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.Almero,Tighten the manual valve to close it.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.


label:
3answers
Senmi Machinery
2floor-- · 2024-04-19 08:11:03

Make an advertisement for you, friends: This AlmeroAxle Co., Ltd product is great value.

See more
Covers and rela
3floor-- · 2024-04-19 08:28:12

Your service is very good, AlmeroAxle Co., Ltd is also very cheap! I will come often in the future!

See more
Agricultural an
4floor-- · 2024-04-19 08:44:11

Feels of value for money, service attitude is very good, AlmeroAxle Co., Ltd workmanship is very good, nothing fussy, all five points

See more
Sign in Post answer
Related issues
view all
Collectors(1)