home page

SlotskGrouting anchorThe form of control error in the use of

2024-04-20 00:47:27release

The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions,SlotskSmall conduit support, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete.Slotsk, grouting can be divided into sectional downward, sectional upward and one-time full depth grouting. The segmented downward type starts from the ground, drills a section of holes from top to bottom, and injects a section of grout. After each section of grouting,SlotskLeading small conduit42, the drilling and grouting continue to be continued downward, so as to alternately reach the designed final grouting depth, and then carries out re grouting from bottom to top; The segmented upward type is that the grouting hole is drilled to the final grouting depth at one time, and the grouting is segmented from bottom to top using a grout stopper; The method of one-time full depth grouting is to drill the grouting hole to the final grouting depth at one time, and then conduct one-time grouting to the full depth. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?Date, Low cost, no loss, free from climate and place constraints.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaTwo convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes,Slotsk22hollow composite anchor manufacturer, which plays a double safety sealing effect.


SlotskGrouting anchorThe form of control error in the use of



Plastic pipe plastic pipe has a low acoustic impedance, and the hydration heat of cement is not easy to dissipate. In view of the great difference between the thermal expansion coefficient of plastic and concrete, the plastic pipe will shrink radially and longitudinally due to the temperature drop after concrete solidification, It may be separated from the concrete locally to cause air or water crevices, and add more strong reflection interfaces on the sound path, which is easy to cause misjudgment.Features of reusable grouting pipe: with one-way switch . Good anti blocking property and no backflow of slurry. Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides.Customer first,In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water and using a drill with a small drill to clean the hole. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes. Classification of grouting pipe grouting pipe the grouting pipe is a plane mesh material of grouting pipe with certain flexibility. The main raw material is polyethylene grouting pipe. It is extruded into thin sheets by a grouting pipe extruder, and then punched with regular holes. Then it is made by directional stretching under the control of heating. It can be divided into unidirectional grouting pipe and bidirectional grouting pipe according to the different stretching modes when it is manufactured.


SlotskGrouting anchorThe form of control error in the use of



The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.reform, Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of soil load, it is a mechanism of dispersing the force on each hole belt and forming a resultant force.Introduction to the advantages of grouting pipe: Simple installation, complete supply; The grouting pipe can be cut at the construction site according to the actual required length of the joint (it is recommended that the longer grouting outlet length should not exceed m); No special installation equipment is required; Grouting time can be arbitrarily selected; When grouting is carried out internally under proper pressure, the grouting pipe fluid can keep filling the whole pipe evenly; The system allows grouting under relatively low pressure; The grouting pressure is .-.mpa; The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed.?Slotsk,They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete. It is applicable to the laying of buried pipes in gas pipeline projects, and is not applicable to the use of open pipes. The service life of pipes will be affected by the perennial ultraviolet corrosion of sunlight. How to use the grouting pipe after rusting will not affect its . The grouting pipe is a kind of rubber plate we often see. It is widely used and has a long service life. It has been praised and recognized by people. Next I will introduce the relevant knowledge of the grouting pipe we produce in detail!The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, not necessarily the thicker the better.


label:
4answers
Shiji Optoelect
2floor-- · 2024-04-20 08:00:45

Ha ha. SlotskGrouting anchor It’s here so soon, it’s not bad, next time you come, you can ask for a discount ^_^

See more
Tengyao Wood Pr
3floor-- · 2024-04-20 08:34:34

SlotskGrouting anchorHow is the quality? Do you have it in stock?

See more
Class II motor
4floor-- · 2024-04-20 09:10:20

SlotskGrouting anchor Very cost-effective! It is worth buying like everyone! worth having!

See more
Berlin Sanyou F
5floor-- · 2024-04-20 09:19:18

You SlotskGrouting anchor are good, is it convenient to place an order?

See more
Sign in Post answer
Related issues
view all
Collectors(1)