home page

New South MemphisAluminum alloy lifting platformNew growth points for industry exports

2024-04-24 00:54:22release

Leakage occurs due to looseness, vibration, and the influence of heat on the sealing surface and pipe joints of the machine; Some casting, processing and other defects are difficult to detect during assembly and debugging, but due to vibration and impact during the operation process, these defects are exposed, manifested as oil (water) leakage. Therefore, leakage is prone to occur during the running-in period. Poor, oil (grease) is not easy to form a uniform oil film on the friction surface to prevent wear. This reduces efficiency and causes early abnormal wear of the components. In severe cases, it can cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of faults.Weekly maintenance: According to the operation instructions, ensure that the elevator is inspected and smooth every dayNew South Memphis,Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.All connecting shafts must have split pins and be sufficient.Himki,  ?? Hidden danger investigation relies on joint efforts from all aspects:?? Construction enterprises are the main responsibility for identifying hidden dangers in construction elevators. They should strengthen daily inspections and regular inspections, and carefully inspect the steel structure, safety protection devices, electrical devices, and transmission devices of construction elevatorsThe wear rate is fast, and due to factors such as processing, assembly, the friction surface is rough, the mating surface area is small,New South MemphisScissor fork type mobile lifting platform, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process in turn, acts as abrasive and continues to participate in friction, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.When disassembling the hydraulic oil tank filler cap, filter cover, hydraulic oil pipe and other parts, first remove the soil around the tank cap. After loosening the tank cap, remove any remaining debris from the joint area (do not rinse with water to prevent water from seeping into the tank). Only after confirming cleanliness can the tank cap be opened. When using materials and hammers, materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned, dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, it may also be unclean). When changing the oil, clean the filter at the same time. Before installing the filter element carefully clean the bottom dirt inside the filter housing with materials.


New South MemphisAluminum alloy lifting platformNew growth points for industry exports



The lifting stage is a high-altitude operation equipment, and prolonged use can cause loose connections between some components. So in order to ensure the personal safety of construction workers it is necessary to regularly inspect the lifting stage and tighten any loose components. The lifting stage is a high-altitude operation equipment, and prolonged use can cause loose connections between some components. So in order to ensure the personal safety of construction workers, it is necessary to regularly inspect the lifting stage and tighten any loose components. The interference and hazard analysis of the frequency conversion speed regulation construction elevator circuit is becoming increasingly widespread in the development of technology today. Variable frequency speed regulation has the characteristics of stable start and stop process, reducing mechanical shock, increasing the comfort of passengers, and improving the service life. At the same time, it can also change the speed of power supply frequency regulation, save electric energy, and improve work efficiency. However, there will be interference in the use of variable frequency speed regulation system, which will often cause safety accidents of construction elevator.During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing,New South MemphisMast type aluminum alloy hydraulic lifting platform, and new and old customers are welcome to come for consultationCheck the oil level of the gearbox and make up for new oil if necessarybuild,Knowledge of pressure lifting platforms, boarding bridges, and more is available in Jiuheng, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory, cooperate and negotiate, smooth tighten, adjust, and prevent corrosion. Before and at the end of each shift, to minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, pay attention to the sound of mechanical operation, and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for managementCheck if the usage period of the speed limiter has expired. If it exceeds the usage period, it is necessary to send it to a qualified professional unit for inspection and calibration. What are the functions of the lifting stage device?Check the interlocking equipment, up and down travel,New South MemphisPrice of unloading mobile boarding bridge, especially in the cold sun or rainstorm climate, the reaction speed will be accelerated, so the exterior paint on the warehouse goods elevator will show signs of aging and then fall off every once in a while. Therefore, when maintaining the equipment of the lift table at ordinary times, pay attention to its storage, and try not to leave it outdoors, let alone in cool days or rainstormproject,Use a feeler gauge to check the wear condition of the worm gear of the worm gear reducer. Please refer to the instruction manual for specific requirementsDuring aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultationLeakage occurs due to looseness, vibration, and the influence of heat on the sealing surface and pipe joints of the machine; Some casting, processing and other defects are difficult to detect during assembly and debugging but due to vibration and impact during the operation process, these defects are exposed, manifested as oil (water) leakage. Therefore, leakage is prone to occur during the running-in period. Poor, due to the small fit clearance of newly assembled components and the difficulty in ensuring the uniformity of fit clearance due to assembly and other reasons, oil (grease) is not easy to form a uniform oil film on the friction surface to prevent wear. This reduces efficiency and causes early abnormal wear of the components. In severe cases, it can cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of faults.New South Memphis,The surface of each part of the brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than %.The reduction gearbox, gearbox, external meshing gear and other parts, as well as the hydraulic oil, are all carried out according to the requirements in the table.The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.


label:
4answers
TECO Jusheng El
2floor-- · 2024-04-24 07:59:19

Old acquaintances, things are as good as always, genuine New South MemphisAluminum alloy lifting platform, outstanding cost performance

See more
Power engineeri
3floor-- · 2024-04-24 09:26:46

It's rare to buy New South MemphisAluminum alloy lifting platform, I saw such a good store. The price is very favorable, the service is also very good, and the things are good. Give me a good encouragement this time.

See more
bucket
4floor-- · 2024-04-24 09:27:12

Ask, can I send New South MemphisAluminum alloy lifting platform specific specifications, let me call you guys.

See more
Tianrui Electro
5floor-- · 2024-04-24 09:51:19

Yes, the top one, honest New South MemphisAluminum alloy lifting platform seller. I have come to buy it a few times, and the service to old customers is very attentive, and I will come often in the future!

See more
Sign in Post answer
Related issues
view all
Collectors(1)