home page

TiheiAutomatic sheet turnover machineBenefits not to be missed

2024-04-26 01:38:16release

Machine room power supply: The power supply should be three-phase V HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersThe treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Tihei,The braking system of the elevator is usually closed, which means it is in the braking state when there is no power, and only when it needs to be turned on, will the power turn on the brakes. So as soon as there was a power outage, the brakes closed and the elevator was braked in mid air. When the elevator descends abnormally, cut off the power and the elevatorIf the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.Monterey,  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height,TiheiRear flip hydraulic plate flipper,TiheiFully automatic high-altitude reclaimer, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors) and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.


TiheiAutomatic sheet turnover machineBenefits not to be missed



The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Mine elevators are used for transporting personnel and goods in mines. Special elevators are designed for special environmental conditions, such as explosion-proof, anti-corrosion, and heat-resistant elevatorsIn the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Finance Department,TiheiElevator for 3-story family villa,Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business including: home elevator manufacturersRestore the command button function in the cabin for firefighters to operate.The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.


TiheiAutomatic sheet turnover machineBenefits not to be missed



Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.OK or not?,Maintenance of elevator hall doors and car doors. Elevator malfunctions usually occur on the elevator hall and car doors, so attention should be paid to the maintenance of the hall and car doors. One is to refuel the fuel on the upper sill of the door and keep it in good condition, as the frequency of opening and closing the door in the elevator is high, which can cause damage to the switch wire. This requires maintenance personnel to inspect it every time they work, and replace it in advance to avoid users having doubts about the quality of the elevator product due to door issues.Household elevators have gradually become an essential vertical transportation tool for modern single family, duplex, multi story, villa and other residential buildings, practical and convenient, and even a beautiful scenery in the home.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Tihei,The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.


label:
5answers
Large-scale eve
2floor-- · 2024-04-26 08:45:49

One word! ! value! ! ! The service attitude is really good, TiheiAutomatic sheet turnover machine delivery is fast. The quality of the goods is also quite good. I like it so much, thank you.

See more
Sale of fly ash
3floor-- · 2024-04-26 08:48:34

I finally waited until I bought it TiheiAutomatic sheet turnover machine. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afraid that the quality was not good. It was not a genuine product. It was a bit different from the picture. However, everything is wrong, the things are good, authentic, the boss is good, and the logistics are good.

See more
Apparel process
4floor-- · 2024-04-26 08:59:31

TiheiAutomatic sheet turnover machine Very good, I will order yours for the next batch.

See more
Hydropower Engi
5floor-- · 2024-04-26 09:13:47

Haha, I like it very much, like and cheer for the boss TiheiAutomatic sheet turnover machine

See more
Maintenance of
6floor-- · 2024-04-26 10:36:50

It’s really a test and waiting. I finally waited for 3 days TiheiAutomatic sheet turnover machine to arrive, the opening quality is very good

See more
Sign in Post answer
Related issues
view all
Collectors(1)