home page

LibretzGrouting anchorChoose an opportunity to sell

2024-07-22 13:33:16release

The length can be matched according to the construction requirements, without loss. Grouting pipe at tensioning end: the grouting pipe installed at the end of the grouting pipe reinforcement and capable of tensioning is also called grouting pipe grouting pipe. The so-called grouting pipe is a grouting pipe in post tensioning structure or component to maintain the tension of the grouting pipe reinforcement and transmit it to the mixed tension; Fixed end grouting pipe: a grouting pipe installed at the end of the grouting pipe reinforcement and usually buried in the concrete without tensioning. The standard of the grouting pipe used for the grouting pipe reinforcement is the national standard of the people&#;s Republic of China (GB / T -, which ensures that the products manufactured by our company conform to the product quality law of the people&#;s Republic of China and the standard law of the people&#;s Republic of China Grouting pipe is the only acoustic pipe specially used for ultrasonic testing in the market. The grouting pipe is made of cold and hard steel pipe after professional molding, and is connected by clamp pressure connection, screw connection, flange connection and other methods. It has a reliable anti-seepage effect during concrete pouring. Two convex grooves are planned at the end of the bell end of the high-strength double seal clamp type acoustic measuring pipe, and the convex grooves are equipped with sealing rings. When installing the device, the socket end of the product is stabbed into the bell end by cm, and then the two convex grooves are kneaded together with special hydraulic pliers. The pipe at the kneaded part is shortened and deformed after being stressed, and the outer pipe between the two convex grooves is deeply immersed into the inner pipe, and then the reliable connection of the product is completed; After being kneaded, the rubber sealing ring deforms and fits between the two layers of pipes, playing an excellent double safety sealing effect.Libretz, Slump test shall be carried out for concrete entering the site. No less than groups of test pieces shall be made for the same batch of concrete with the same strength grade. One group is used for standard curing, and the other two groups are used for curing under the same conditions to determine demoulding and allowable lifting time.Answer: it varies according to the model and elasticity of the grouting pipe,Libretz48lead small conduit, and its internal pressure can reach bar or more.Nagarote,The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally,LibretzAdvanced small conduit processing, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.


LibretzGrouting anchorChoose an opportunity to sell



If any crack is found, it shall be repaired in time, otherwise, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available the method of hot vulcanization connection can be used.? The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed. The key construction process flow of grouting pipe installation is as follows: table formwork processing, installation - grouting pipe processing - spring reinforcement framework,LibretzAdvance small conduit support, mesh binding - grouting pipe and installation of embedded reserved side formwork installation - process acceptance - concrete pouring - concrete curing - m data thickness to ensure the integrity of the table formwork, the steel plate joint weld shall be uniform.The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.Finance Department,How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete. It has good air tightness, low gas permeability, strong sealing and no leakage. The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.


LibretzGrouting anchorChoose an opportunity to sell



The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating extrusion, molding, stretching, shaping, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Quality management, Low cost, no loss, free from climate and place constraints.[] it should be noted that the above specific embodiments are only exemplary. Under the above teachings of the utility model those skilled in the art can make various improvements and modifications on the basis of the above embodiments, and these improvements or modifications fall within the protection scope of the utility model. Those skilled in the art should understand that the above specific description is only for the purpose of explaining the utility model, and is not intended to limit the utility model. The scope of protection of the utility model is defined by the claims and their equivalents.Can the stretching speed of grouting pipe be defined?Libretz,Answer: it varies according to the model and elasticity of the grouting pipe, and its internal pressure can reach bar or more.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistance The length can be matched according to the construction requirements, without loss.


label:
4answers
Xinrong Rubber
2floor-- · 2024-07-22 14:11:11

I have been shopping online LibretzGrouting anchor for so many years, this is the first time I have taken this seriously. I am very satisfied with the product quality and workmanship.

See more
Metal door and
3floor-- · 2024-07-22 14:24:53

A good seller, even a novice, a lot of LibretzGrouting anchor don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment, and finally figured out the problem that I didn’t understand.^- ^Learn more in the future!

See more
City and road l
4floor-- · 2024-07-22 15:23:51

After my personal experience, the reputation of this store is quite good. LibretzGrouting anchor The quality is more like a diamond. Thank you so much!

See more
maintain
5floor-- · 2024-07-22 15:31:54

Happy cooperation, give your company support and wish business prosperous.

See more
Sign in Post answer
Related issues
view all
Collectors(1)