home page

CaborojoSeamless pipeThe inertial rise in prices is still the main situation at present

2023-03-22 00:12:07release

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the common disadvantages of grouting pipe grouting method, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process, good flexibility, fast construction speed, and is more suitable for situations requiring rapid response.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.CaborojoSeamless pipeThe inertial rise in prices is still the main situation at present,2023-03-2200:12:07Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The secondary grouting pipe can only be grouted once and cannot be reused.

CaborojoSeamless pipeThe inertial rise in prices is still the main situation at present


The grouting mechanism includes filling grouting,CaborojoGrouting pipe, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method,CaborojoSeamless pipe,CaborojoPrecision tube, high chemical grouting method and cement grouting method.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.Caborojo,peace,Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up the pipe core and the outer wall of the pipe shall be washed clean.

label:
3answers
insurance agent
2floor-- · 2023-03-22 08:12:53

Just paid, when will CaborojoSeamless pipe arrive, boss.

See more
elevator
3floor-- · 2023-03-22 08:33:14

I heard a colleague's introduction to buy CaborojoSeamless pipe, and they all said that the quality is good, and I will come to your house next time. Ha ha.

See more
Xuanlang Enviro
4floor-- · 2023-03-22 08:44:14

The packaging CaborojoSeamless pipe looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

See more
Sign in Post answer
Related issues
view all
Collectors(1)