home page

AvignonPower electronic equipmentNews Quotation

2023-03-24 23:58:45release

What about oil immersed transformer fire?The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).Avignon,After the power transformer has been used for a long time, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.Hard,Power transformer factorySound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.


AvignonPower electronic equipmentNews Quotation



Protective measures for damping of dry-type transformerRight, as & ldquo; Great Lars car & rdquo;, After replacing one kva small transformer, the utilization rate is close but the main parameters of the two transformers are evaluated as shown in Table . Table evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, It actually consumes electromagnetic energy.Oil leakage of cast iron partsranking the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer,Power transformer plantOil leakage at electric welding positionWhen the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,


AvignonPower electronic equipmentNews Quotation



The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.Total quality management,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip,AvignonMain components of box transformer, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.Avignon,The whole process of hanging the core of dry-type transformer is more critical,Avignon35kV oil immersed transformer, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters,AvignonDry type power transformer 1000 KVA, so as to promote the safety of dry-type transformer!In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, so as to reduce the electric field component intersecting with the insulating parts.

label:
3answers
gabion metal pr
2floor-- · 2023-03-25 07:11:54

A good seller, even a novice, a lot of AvignonPower electronic equipment don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment, and finally figured out the problem that I didn’t understand.^- ^Learn more in the future!

See more
Wind and dust s
3floor-- · 2023-03-25 08:07:55

Great AvignonPower electronic equipment, very good service, thank you.

See more
freight forward
4floor-- · 2023-03-25 08:27:58

The first online purchase AvignonPower electronic equipment. I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is also very good. I like you!

See more
Sign in Post answer
Related issues
view all
Collectors(1)