home page

the danubeTransformer inductorNeed maintenance to extend the life of use

2023-03-27 22:32:48release

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.What is the important role of power transformerthe danube,After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration the bottle cap shall be tightly closed and cannot be opened before application.Armenia,In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Oil leakage of cast iron partsSeal oil leakage


the danubeTransformer inductorNeed maintenance to extend the life of use



When the power transformer operates at full load, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core its orientation and size change with the change,the danube1000 dry type transformer size, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy,the danubeAlarm temperature of dry-type transformer,the danubeWhat do you think of box transformer meter, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling person, weather conditions and other materials of the oil sample.Information recommendation,Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying the treatment goal can be achieved.What is the reason for the shutdown of power transformer?Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.


the danubeTransformer inductorNeed maintenance to extend the life of use



The tap changer of power transformer shall also have strong insulation. kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.management,Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.The transformer manufacturer will introduce the efficiency of the transformer to youThe voltage regulating tap changer is not in place or poorthe danube, clean the periphery of the sampling port with clean or hairless linen.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

label:
3answers
Bowen Metal Pro
2floor-- · 2023-03-27 23:51:30

Although the danubeTransformer inductor has not yet arrived, I am looking forward to it, and the inquiry is still in transit.

See more
Gabion
3floor-- · 2023-03-27 23:51:38

Just paid, when will the danubeTransformer inductor arrive, boss.

See more
Zhule Electroni
4floor-- · 2023-03-28 07:30:00

the danubeTransformer inductorHow much is it and how can I sell it?

See more
Sign in Post answer
Related issues
view all
Collectors(1)