home page

Port AntonioCold storage installation equipmentDevelopment needs

2023-04-26 12:47:05release

Reasonable space: the power consumption of the cold storage is calculated according to the cold consumption of the cold storage, which usually includes two parts: the cold consumption during cargo cooling and refrigeration; It is the cooling consumption of the refrigeration room itself and operation management.The use of large-scale cold storage is naturally very strict in installation and material selection. Therefore, in the face of the above possible situations, we can strictly screen the insulation board materials of cold storage, which can effectively alleviate or solve the above problems. However, at present,Port AntonioWhat is frozen medicine, there are many fields using cold storage insulation board, so the details of the use environment should be considered for the wood making of many such products in the market.Port Antonio,According to the technical requirements for the installation of cooling fan, when selecting the lifting point position, the position with good air circulation shall be considered first. Secondly, the direction of library structure is considered.When opening and drilling is required for the top warehouse plate or wall plate, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, and the opening and drilling shall be carried out after review; The inlet hole, liquid inlet hole, return hole, water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets, with a spacing of mm and mm outside.Elektrenai,Commissioning cold storage. After all parts of the cold storage are installed and connected, the cold storage can be started for cold storage commissioning. According to the needs of customers, adjust the value of the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.The combined cold storage door starts frequently or does not start for a long time, or does not stop for a long time, or stops before the storage temperature reaches.General quick-frozen warehouses are mostly cooled by refrigeration mechanisms, and those with very low gasification temperature are used as coolant to evaporate under low pressure and mechanical conditions so as to absorb the heat in the warehouse, then install the floor select a beautiful floor and put it in a conspicuous place, and do a good job in the floor and evaporator drainage system.Establish a perfect computer network to realize the scientization of refrigeration supply chain distribution and traceability. In the European Union, all members of the food supply chain have the legal responsibility to implement traceability.As a coolant, make it evaporate under low pressure and mechanical conditions to absorb the heat in the storage, so as to achieve the purpose of cooling.Inspection basis,Step of cold storage design: define the volume of the cold storage warehouse. The size of the cold storage should be based on the design of a large number of agricultural products to be stored for a long time. This volume is calculated based on the essential volume of stored goods accumulated in the cold storage, plus the row to row corridors, the indoor space between the pile and the wall, the ceiling and the gap of the packaging house. After the volume of the cold storage is determined, the length and height width ratio of the cold storage shall be determined. Necessary auxiliary engineering buildings and equipment shall also be considered in the design of cold storage, such as working intermediate, packaging and combing room, special tool warehouse, loading and unloading platform, etc.Danfoss thermal valve is adopted for the thermal valve of the cold storage, with guaranteed quality; Due to the high temperature requirements of the cold storage and the high degree of automation and regulation of the temperature, the temperature system of the cold storage adopts microcomputer full-automatic,Port AntonioCold storage manufacturer,Port AntonioInstallation and construction price of cold storage, does not need special people to operate, and can be remotely controlled. When the temperature exceeds the specified range, it will automatically alarm, which is of great significance to the proper preservation of the cold storage.The foaming technology of polyurethane with strong stability makes it have superior bonding performance. The firm combination of polyurethane rigid foam and carrier layer is the basic premise to ensure the stability of external insulation layer. That is, under the unfavorable local temperature and humidity conditions, self weight and normal collision, and the insulation layer still does not separate and fall off from the carrier layer and remains stable in the state.


Port AntonioCold storage installation equipmentDevelopment needs



The physical properties of polyurethane insulation board are relatively good, and service. It has long been specialized in cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage and medical cold storage. It improves the overall performance of the polyurethane insulation board and enables the polyurethane insulation board to work for a long time, Polyurethane insulation board has also become one of the main exterior wall materials.Honest management - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance and make U-bend and silica gel outside the storage.If the wholesale equipment of the fresh-keeping storehouse is started again after a long-term suspension, the speed should be reduced at the initial stage of the wholesale opening of the fresh-keeping storehouse. Don't start too fast. It's better to reduce the speed at about - degrees every day. When the temperature drops to degrees, it should be maintained for a period of time. Don't regulate it at will.Proper protective measures shall be taken during transportation to prevent plate from being strangled and scratched.Port Antonio,Quick freezing storehouse is widely used. There are many kinds of temperature in quick freezing storehouse, and multi temperature or double temperature can be realized to meet the needs of different customers. Fault phenomena: unit current is large and voltage is too low; Loose wiring; The unit pressure exceeds the rated pressure; The oil separation core is blocked; Device failure; Host failure; Main motor fault; Fault phenomenon: the unit cannot be started and the fuse is broken; The temperature switch is broken; Loose wiring; Thermal relay of main motor acts; The thermal relay of cold storage fan motor acts; The transformer is broken; No power input (unit); Failure not eliminated (unit); The actuator is faulty.The spacing of pull rivets at inner and outer corners is mm and mm respectively; After the polystyrene library is installed, the wall panel joints shall be evenly sealed and decorated with silicone sealant.The two sets of connectors between the cold storage shall be wedged tightly, and the two sets of connectors shall be fixed at the upper, outer and lower sides of the cracks in the cold storage respectively. The lower connector shall be as close as possible, so as to facilitate the use of concrete to cover the connector in the future.

label:
6answers
Anjia Home Impr
2floor-- · 2023-04-26 13:22:56

Make an advertisement for you, friends: This Port AntonioCold storage installation equipment product is great value.

See more
Venture capital
3floor-- · 2023-04-26 13:33:01

Port AntonioCold storage installation equipment The goods have arrived, much better than what you see in the picture!

See more
Yihe Building M
4floor-- · 2023-04-26 13:58:54

Port AntonioCold storage installation equipmentThe quality is good, completely beyond expectations, and the delivery speed is very fast.

See more
Acquisition of
5floor-- · 2023-04-26 14:29:12

I'm busy, I forgot, I'm sorry, what else can I say~~ This Port AntonioCold storage installation equipment is really good, lucky enough.

See more
Luan Auto Repai
6floor-- · 2023-04-26 14:38:36

Happy cooperation and tight packaging. Let’s talk about business services: Like

See more
Street Colleagu
7floor-- · 2023-04-26 14:44:33

I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online Port AntonioCold storage installation equipment, thank you!

See more
Sign in Post answer
Related issues
view all
Collectors(1)