home page

BadwaslauDistribution transformer structureEconomic slowdown is a healthy adjustment

2023-05-03 00:46:52release

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).BadwaslauThe grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.The hanging core of dry-type transformer is a vital partBoudouaou,The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.Seal oil leakage(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.


BadwaslauDistribution transformer structureEconomic slowdown is a healthy adjustment



In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitThe appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, so the usual load is KW, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %Oil leakage of heat pipe radiatorApplication process,The hanging core of dry-type transformer is a vital partOutdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Sound in case of phase failure


BadwaslauDistribution transformer structureEconomic slowdown is a healthy adjustment



In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.Bidding,From the appearance, and only the shell can be seen for oil immersed transformer;Transformer manufacturers said that at this stage China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field,BadwaslauPicture of oil immersed transformer disassembly, uneven companies, lack of evaluation and specifications,BadwaslauWhat are the oil immersed transformer protections, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.Noise solution of dry-type transformerBadwaslau,When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.After the oil is drained,Badwaslau2000 KVA power transformer, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

label:
6answers
Leather Garment
2floor-- · 2023-05-03 08:20:01

The quality is very good, really good, BadwaslauDistribution transformer structure the same as the picture, the packaging and quality are also very good,

See more
Youweike Dried
3floor-- · 2023-05-03 08:49:54

The packaging BadwaslauDistribution transformer structure looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

See more
Yihe Building M
4floor-- · 2023-05-03 08:58:07

The stuff is really good, but BadwaslauDistribution transformer structure the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your shopping guide.

See more
Xiangze Wire Me
5floor-- · 2023-05-03 09:14:50

After looking for the BadwaslauDistribution transformer structure from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

See more
Keming Construc
6floor-- · 2023-05-03 09:23:32

BadwaslauDistribution transformer structureYes, give you a good comment

See more
Sports and Ente
7floor-- · 2023-05-03 09:37:12

BadwaslauDistribution transformer structure It was posted very quickly, really timely, please give me a thumbs up

See more
Sign in Post answer
Related issues
view all
Collectors(1)