home page

BrunswickModel and parameters of power transformerApplication in intensive care

2023-05-05 03:26:52release

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out and then Fushi blue raw materials shall be selected for sealing treatment.Wiring mode of dry-type transformer:Brunswick,Maintenance contents of power transformerAnalysis of common faults of oil immersed transformer:Tasboget,In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.In relay protection dry-type transformer, if there is any problem at a certain point, it will affect the whole power circuitThe scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?


BrunswickModel and parameters of power transformerApplication in intensive care



Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, for the general application environment, the class H dry-type transformer can be used.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Price,After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.Oil leakage at electric welding positionIn the case of using dry-type transformer,BrunswickProtection grade of oil immersed transformer, customers must master the method of wiring. If there are problems in wiring,BrunswickTransformer three-phase transformer, it is easy to cause common faults in application. So what is the wiring mode of dry-type transformer?


BrunswickModel and parameters of power transformerApplication in intensive care



The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Installation requirements,Power transformer manufacturerThe rate of transformer is: n = P / pxo%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about %, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer,BrunswickOn load voltage regulating distribution transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.Brunswick, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, it should be insulated before putting into use and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).For no-load impulse closing of transformer, pay attention to the following matters:

label:
3answers
haifeng ceramic
2floor-- · 2023-05-05 11:47:20

Haha, I like it very much, like and cheer for the boss BrunswickModel and parameters of power transformer

See more
Golden Diamond
3floor-- · 2023-05-05 12:13:45

Just received the goods, very good, BrunswickModel and parameters of power transformer great value for money! ! Come in the future!

See more
TECO Jusheng El
4floor-- · 2023-05-05 12:17:46

The packaging BrunswickModel and parameters of power transformer looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

See more
Sign in Post answer
Related issues
view all
Collectors(1)