home page

ShijakSeamless pipeWorking principle and application of

2023-05-06 01:04:43release

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, stop leakage, strengthen and correct the deflection of buildings.

ShijakSeamless pipeWorking principle and application of


According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, advance small conduit, new and old customers are welcome to consult to determine the grouting pressure and flow pipe shed pipe and grouting pipe factory. During the preferential activities,ShijakSeamless pipe, and determine the grouting slurry and its initial concentration.According to the sequence of sectional construction along the stratum depth grouting can be divided into sectional downward, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.ShijakSeamless pipeWorking principle and application of,2023-05-0601:04:43Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,ShijakGrouting pipe, aerated silicification method and electric double liquid silicification method.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

ShijakSeamless pipeWorking principle and application of


● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section,ShijakPrecision tube, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.Shijak,Guatemala,Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.

label:
3answers
Feo Wire Mesh P
2floor-- · 2023-05-06 08:32:15

ShijakSeamless pipe How much is the minimum, can it be wholesale

See more
Yiqiao Steel Tr
3floor-- · 2023-05-06 08:37:36

I'm quite satisfied, and the quality and workmanship are even worse. Look back and introduce to friends

See more
Pengxi Conveyin
4floor-- · 2023-05-06 08:43:04

ShijakSeamless pipe Very satisfied, good quality.

See more
Sign in Post answer
Related issues
view all
Collectors(1)